Tuesday, June 7, 2016

Port Lincoln Feb-May 2016

An enjoyable few days in Phuket before our enjoyable flight at the pointy end of the plane to Adelaide via KL. All up only 11.5 hours includes the transfer in KL. Then a 7 hour wait in Adelaide - miss all the earlier flights by minutes or to close to our arrival times to book = BUGGER!!


We arrived home to a vivid green Winters hill in February. The 25mm precipitation earlier in the month helped.


1st project to sort out the down pipes = ugly!










Just some painting to do and all done, a bit of carpentry required to fit the rectangle PVC between the decking joist.
Out to visit Chook and TJ. We installed the signage whilst they weren't watching, and them had a reason to go to town with the return signage surprise. TJ can now add her artistic touches!
Bugger, our walking trail compromised - easy to walk around, council took a week to find it and get the crew into remove it
Clean up Australia Day with the Friends of Parks - we selected Maclaren Point due to the 4 x 4 nature of the track




A good bag full of trash contributed
Claimed a CHILI bush from Chris and Faye's drive way, alas the tap root went under to slab and broke off on removal - heaps of fresh frozen and later dried chilies.
It's finally happening, the trees gone! and we are off to the Lincoln National Park - Horse Rock
A quick wade along the blue line scored a feed x 2 
Cooked and down the hatch
No shortage of razor fish
How's that for the start of the day!!
New marine search and rescue vessel - impressive, dropped over to check our safety gear etc. With twin 200 hp outboards it flies!
View looking west from Wanna cliffs - beaches in front of the Wanna sand hills
Thru the Wanna sand hills to the beach - good gutter for salmon fishing. How ever do not drive on the beach it's deadly = soft. We parked up in the sand hills and walked
African Daisy -eradication
Yep! day out with Friends of Parks to dig up the offending African Daisies, we removed over 200
Contacted Duncan for the car port decking and roof tie in - able to do within a current work window - Alas the timber took 3 weeks to be delivered, thus delayed the project with other contracts etc. A total of 2 months to complete. Meanwhile I had to get my drainage system in place. I came in from our camp site to get it in place, did not need to worry due to the delayed delivery of the timber - Mitre 10




Our Pirtek Challenge entries - no joy there! 
Our Mallee Fowls used to reside here, until their feet rusted off and dumped by the trash bin's.
Perfect Moment in bloom
A relic found by our mate Jim when digging a trench for our phone line at 88 Murchison St. 
Starting work on the car port tie-in - remove the iron
Flex pipe used for drainage - 4mtr stretch to 16 metres only 2 sections required and no elbow's, connectors and or glue required
Our street sign removed - Our neighbour Nev heard some noise around 0100 hrs - I called council 0915 hrs Monday 29th
Drainage and iron sheeting removal done. Removed iron will be used for the roof  tie-in as same profile as existing car port roof
Site storm water drainage 
Record time - 1100hrs council workers on-site to install our street sign


Lee's property, once I found the limestone, it was easy digging to the storm water pipe approx 600mm deep, and still relatively soft after 30+ years - our storm water tie-in to his piping
Daisy - my assistant, complete with BALL for play time
Finally the timber has been delivered - hopefully in place before Linden and family arrive along with John and Helen.
Another 'GLOWING' day born
Dreary day for the cruise ship to visit
Ashley's 60th at the Tasman Hotel - he's off on his BD of the 10th - bullion detector training in W.A.s Cue
Decking completed on time for our visitors - just! ______

and what a difference already, notice no step
Now the roof tie-in to go!
My hill view reading chair = magic
Our morning walk found this on the road, it fired up but died. Linden and family arriving later in the day - they will have an iPhone charger - yep! all charged with the above results. Able to make out the last caller - whom happened to be his Mum, thus called and they came around later to get his demolished phone at least the chip/sim still works. 21st Birthday party got out of hand and roaming the streets it seems. 
Linden's in the comfortable recliner - soon in snooze land!!
Yep! we have visitors
Coffin Bay jetty fishing trip = Bait - 20+ tommies and a few salmon trout for our HOB fishing trip in October
Matt and BJ ready for the cot!!
We dropped by the North Shields cemetery to visit Dad, Mum and Joy along with several others
Finally slowed the 'BOY's' down with some food. Matthew, Samuel, BJ and Issac Karena's twins  
The spread!!
Our King Ash Bay and Melbourne friends - Helen and John - yep! more food to eat folks.


Now you have the Stat's and phone numbers when you visit Port Lincoln
John and Helen camped at Chook and TJ's place and arrived in day light to park up on our private road
John's Engle's x 2 are hooked up to power to keep the frozen supplies in good condition for their trip to King Ash Bay
Private van parking on our concrete no thru road street


Crikey - where did that week go, and they are off home already - back to school boy's
One of  Victoria's Great Ocean Road Apostles has surfaced here at Wanna Cliffs. or perhaps it's one of our own. Out for a local tour of our national park.
Small grain ship being maneuvered into the wharf
Now! that's a good size ship
We no sooner arrived home from DK Quarries and this fellow turned up with 2 ton's of crusher fines. I had no idea how much 2 tons was until I moved it twice, once to the holding pit, then as I used it - didn't go very far, but it covered what needed to be done this time around!!
1st up - Tie in some drain grating with the now buried storm water flex pipe
Hard yakka with the clay base
Progress is been made, with the assistance of my technical adviser - Nev, 50+ year veteran of SA Water. After doing the calculations of a meter section it was determined I had enough paver's to use a two brick/paver's as apposed to one as per my initial intention. Paver's previously salvaged from the block where the rain water tanks now stands  
3 days later looking good!!With more paver up along the shed to go. Plus around the bed in the immediate foreground
Plumber called into connect the storm water - tricky sleeve available, with no hi-tech cutter required - just a plain old wood saw
55 minutes later - all done, that included drive time to and from hardware store to get fittings required - I would still be stuffing around hours later.
At last some action happening on the roof tie-in - again delays with the steel required and Duncan's work schedule. 
Here's the project finally completed mid June
Meanwhile we were off__
to Peak Bay - Wiseman's Beach - our immediate neighbours Jumbo and Mandy fishing camp 
Complete with bush bench
Marked the track from the beach over the sand hills for a future recee
Bee hive - later washed out with the storm and king tide
Stashed some treasures for later collection
Marine Rescue - just in case you need the details


Jumbo's camp
Our camp with all the mod con's
One of our favourite's - lamb shanks, Sue's camp ground nick name -
 The Bone Lady!!
Magic morning and 
calm as a mill pond, as Sue was demonstrating. The previous day we got blown by a Nor Wester off the water which created washing machine turbulence 
Yep! just had to show we are catching a feed or 2.
Along with a couple of large SQUID!
Jumbo's place in day light
Sue pet - pig 'Hazel'
The beach and ocean for that matter all to ourselves

This lad tried to drive around the locked gates at Jumbo's place
1st Rescue attempt failed (Not by us)
He's a good way into the salt flats. 
Oh! no not again - Monday morning into town as the weather forecast was correct with gale force winds. Our camp site protected in the sand dunes, and our tinnie on dry land
Circles in the sand!!
This is Jumbo's rain gauge lid - 200 meters from it's housing - yep it blew!
King tide washed out the boat ramp gravel and sand, leaving exposed boulders and seaweed 
Back on the beach to salvage my treasure collected after the storm - beauty, tie onto this bit of rope, as unable to budge maually = bugger, only buried 2mtr's
A tinnie load of rope and drift wood
The rope_____
and other treasures sorted__
more treasure further around the beach on my bike ride - the aluminium boat hook/gaff a bonus
Bike and walk to 2nd landing where we had previously camped on the Lauries property @ $10/ night. Beach launch ramp also washed out
Interstate campers - up to 15 vans of various descriptions lob here every year for 4 months
This fellow has be banished from the site - hence the name 'LEPPARVILLE'
Built in one of the Lauries padocks, from salvaged materials it seems
Even running water, gate with marker pegs thru the sand hills to the beach
More drift wood - Project ideas formulating
Now complete with a solar powered Nav. light Jumbo salvaged from a wreck
Yep! it's getting cold 'Hazel'
All packed and secured - $400 for an unsecured
load 
Pro colour squid jig
Burning the trash and rope I was unable to untangle

Morning walk sun rise 
Back home in time for - Foxtel intallation
Very slick - at it 18 years, with 30 connection in Lincoln - tradie from Whyalla
Paving done and tree / shrub planted to hide the neighbours door and dunny window in due course - Grow,grow, grow!
and still have a few brick / paver left to finish off the ramp up the side of the shed
Out helping Chook and Tim get one of the chook shed's water proof, gutter and flashings
Rebecca's been painting fence post and rails
Other Chook's chook nesting box - all from salvaged scrap including the teck and wood screws 
Yeah! I am puffing - 4 bags of ready mix cement mixed by hand - 2 bags at a time from here on in!
Finally got around to this project - carport concrete cut for the electrical and shed water services and renewed shed roof piping 
My estimate of 8 bags, but required 10-1/2 

Our tree lit up
VHF radio aerial mount sikaflexed to the tinnie hull, the jack and timber worked well - 24 hours to cure

Getting it all together
Lunch with Clarrie and Helen - Webber rotisserie
Roast lamb with a honey glaze - yum!! 
Almost good to go, a fine tune and cable length adjustments. Battery pack modified with clip in 12 volt sockets
A good job done - finally, next paint the sink piping
Before ______
After ____ raised the fence height 900mm - to at least limit the view down the side of our property
Before______
All parked up______
Alfie - came for a visit before we departed
Covered and good to GO!!
Thai style child seat!! At least it's visible!
Phuket - it bucketed down = tropical rain!
What's this a real round about in Songkhla 

That's all for now folks